The TRITON AP-EMAIL v8.0.x upgrade process includes appliance components (V-Series appliance, X-Series security blade, or virtual appliance), along with TRITON Manager and Email Log Server Windows components. A virtual appliance upgrade applies only to version 7.8.0 and later, and an X-Series security blade upgrade applies only to version 7.8.4 and later.
Important
V-Series appliance users:
Some older V10000 and V5000 appliances are not supported with version 8.0.0 and higher.
See
V-Series appliances supported with version 8.0
.
Because a data loss prevention module is included with TRITON AP-EMAIL, you should consult the TRITON Manager Data module upgrade procedures, to ensure a smooth upgrade experience. See
Upgrading to TRITON AP-DATA v8.0.x
for details.
If you are running Email Security Gateway version 7.8.x or version 8.0, you can upgrade directly to TRITON AP-EMAIL version 8.0.x. You must perform intermediate upgrades if you are running any other previous version of Email Security Gateway.
The following upgrade paths are available from version 7.6.x:
7.6.0 > 7.7.0 > 7.8.0 (with V-Series appliance version 7.8.1) > 8.0.x
7.6.2 > 7.7.0 > 7.8.0 (with V-Series appliance version 7.8.1) > 8.0.x
7.6.7 > 7.7.0 > 7.8.0 (with V-Series appliance version 7.8.1) > 8.0.x
Any version 7.6.x Email Security component that is currently installed on Windows Server 2003 must be migrated to Windows Server 2008 R2 before the upgrade to v7.7.0. Migration to Windows Server 2012 may be performed after an upgrade to v7.8.0.
The following upgrade paths are available from version 7.7.x:
7.7.0 > 7.8.0 (with V-Series appliance version 7.8.1) > 8.0.x
7.7.3 > 7.8.0 (with V-Series appliance version 7.8.1) > 8.0.x
You should ensure that third-party components are upgraded as well, to work with your new email protection solution version.
We recommend that you perform a complete system backup in the event your system experiences a power outage during the upgrade process. Recovery procedures are also included in case they are needed.
Contents:
Backup procedures
Recovery procedures
After preparations are complete, perform the appropriate upgrade procedure:
Upgrading Email Security Gateway v7.6.x to v7.7.0
Upgrading Email Security Gateway v7.7.x to v7.8.0
Upgrading Email Security Gateway v7.8.0 to v7.8.x
Upgrading Email Security Gateway v7.8.x to TRITON AP-EMAIL v8.0.x
Upgrading Email Protection Solutions
Copyright 2016 Forcepoint LLC. All rights reserved.